英文合同

时间:2022-01-25 10:00:25 合同 我要投稿

英文合同范文6篇

  在当今不断发展的世界,合同在生活中的使用越来越广泛,它可以保护民事法律关系。那么一般合同是怎么起草的呢?下面是小编收集整理的英文合同6篇,欢迎大家分享。

英文合同范文6篇

英文合同 篇1

  Address:

  Telephone:

  Party B: Address:

  Telephone:

  According to the provisions of the contract law of the People's Republic of China and the relevant laws and regulations, Party B accepts the entrustment of the first party and entrustment with the two parties through consultation.

  First, entrustment:

  Two, the way of payment:

  1, Party A shall pay 40% of the total cost of the contract, namely ____ yuan (RMB) to Party B, Party B received the money after the start of design.

  2. Party B shall provide complete design draft. After confirmation by Party A, the total amount of the total cost shall be paid.

  Three. Design time:

  1, Party B shall provide complete design draft in __ working days.

  2, Party B shall complete the design work of party a company commissioned in _____ years __ month __ day (delay time by party a reason, work time should be postponed).

  Four. The responsibilities and obligations of the two parties:

  1, Party B shall, according to the requirements of Party A to finish the related work on time.

  2, Party A has the responsibility to fully cooperate with Party B to carry out the work stipulated in this contract and provide relevant information according to the needs of Party B. Party A is responsible for the consequences caused by Party A's delay in the required information.

  3. Party A shall provide complete design information before the start of the design, due to Party A's provision of incomplete information and changes in content.

  For structural changes, Party A shall pay the corresponding cost of design changes.

  4. After Party B receives the complete design information of Party A, it is designed to facilitate the determination of the style of Party A, and Party B begins to design the first draft after the style is determined.

  5, Party A has the right to put forward amendments to the works designed by Party B. The first draft Party A can make a structural modification. After the first draft is determined, the structural modifications should be made. Party A shall pay the corresponding cost separately.

  6. The consequences of the delay due to the amendment of Party A shall be borne by Party A.

  7, due to the loss caused by post production by Party A alone, the loss caused by problems in the design of the product is borne by Party B. The legal liability caused by copyright, for the economic disputes shall be borne by Party a..

  8. During the course of the project, Party B is attached to the brand of Party A and shall not sign any form of cooperation agreement with the customer in the identity of Party B.

  Five. The agreement on intellectual property rights:

  1, Party B has the copyright of the works completed by the design. After the settlement of all the fees designed by Party A, Party B may transfer the copyright of the works to Party A.

  2. Before Party A has not paid all the cost of the design, the copyright of the works designed by Party B shall be attributed to Party B, and Party A does not have any right to the work.

  3. Party A shall have the right to investigate the legal liability of Party A if it uses or amends the works designed by Party B before the payment is not paid.

  Six. Liability for breach of contract:

  1, Party A terminates the contract before the completion of the first draft of the design work. The prepaid expenses have no right to request the return. If a party terminates the contract after the completion of the first draft of Party B's work, it shall pay the full design fee.

  2. If Party B terminates the contract without proper reasons, the fees charged shall be returned to Party A.

  Seven, if a party or a party has a dispute over the performance of this contract, it shall be settled amicable through negotiation. If either party fails to negotiate, any Party A and B can submit it to the Beijing Arbitration Commission for arbitration.

  Eight, the contract is effective from the date of signature by Gai Zhang and both parties. The contract is two copies in one form. Each party has one contract signed by the other party (Gai Zhang), which has the same legal effect.

  Nine. If there is no matter in this contract, the two parties shall jointly discuss and supplement the contract. The contents of the supplement and modification are equally valid to this contract.

  Party A: Party B:

  (signature seal) (signature seal)

  Date: Date:

  中文版

  地址:

  电话:

  乙方:地址:

  电话:

  依据《中华人民共和国合同法》和有关法规的规定,乙方接受甲方的委托,就委托设计事项,双方经协商一致,签订本合同,信守执行:

  一、委托事项:

  二、付款方式:

  1、甲方需在合同签订之时支付总费用的40% ,即____元(人民币)给乙方,乙方收到甲方的款项后开始设计。

  2、乙方提供完整的设计稿,甲方确认后,应当即付清总费用的全部余款。

  三、设计时间:

  1、乙方需在__个工作日内提供比较完整的设计稿。

  2、乙方需在_____年__月__日完成甲方公司委托的设计工作 (由甲方原因耽误的时间,完稿时间应顺延)。

  四、双方的责任与义务:

  1、乙方应按甲方要求按质按量按时完成相关设计工作。

  2、甲方有责任全力配合乙方开展本合同所规定的工作,并根据乙方需要提供相关资料。由于甲方提供所需资料延误时间造成的后果,由甲方承担。

  3、甲方应在设计开始前提供完整的设计资料,由于甲方提供资料不完整、内容改动而造成的设

  计结构改动,甲方须另行支付相应的设计改动费用。

  4、乙方收到甲方的完整设计资料后进行部分小样设计以方便甲方确定风格,风格确定后乙方开始进行初稿设计。

  5、甲方有权对乙方所设计的作品提出修改意见,初稿甲方可提出一次结构上的修改,初稿确定后的结构修改,甲方须另行支付相应费用。

  6、因甲方修改,延误时间造成的后果,由甲方承担。

  7、由于后期制作造成的损失由甲方独自承担,由于制作物设计出现问题造成的损失由乙方承担。 因版权、文责所引发的法律责任,经济纠纷由甲方承担。

  8、设计项目期间乙方挂靠于甲方品牌之中,不得以乙方身份单独与客户签订任何形式的合作协议。

  五、知识产权约定:

  1、乙方对设计完成的作品享有著作权。甲方将委托设计的所有费用结算完毕后,乙方可将作品著作权转让给甲方。

  2、甲方在未付清所有委托设计费用之前,乙方设计的作品著作权归乙方,甲方对该作品不享有任何权利。

  3、甲方在余款未付清之前擅自使用或者修改使用乙方设计的作品而导致的侵权,乙方有权追究其法律责任。

  六、违约责任:

  1、甲方在设计作品初稿完成前终止合同,其预付的费用无权要求退回;甲方在乙方作品初稿完成后终止合同的.,应当支付全额的设计费用。

  2、乙方如无正当理由提前终止合同,所收取的费用应当全部退回给甲方。

  七、甲乙双方如因履行本合同发生纠纷,应当友好协商解决,协商不成的,甲乙双方任何一方均可向北京仲裁委员会提请仲裁解决。

  八、本合同自甲乙双方签字盖章之日起生效,本合同一式两份,双方各持对方签字(盖章)合同一份,具有同等的法律效力。

  九、本合同如有未尽事宜,由甲乙双方共同讨论补充或修改。补充和修改的内容与本合同具有同等效力。

  甲方: 乙方:

  (签字盖章) (签字盖章)

  日期: 日期:

英文合同 篇2

  Contract No.: ________________________.

  Date of Signature: ____________________.

  Place of Signature: ____________________.

  This Contract is made and entered into through friendly negotiation by and between China ____________________ (hereinafter referred to as “Client”), as one party, and____________________ (hereinafter referred to as “Consultant”), as the other party, concerning the technical consultancy service of__________, under the following terms and conditions:

  Article 1 Contents of Technical Consultancy Service

  1.1 Whereas Client desires to obtain the technical consultancy service from Consultant and Consultant has agreed to perform such services.

  1.2 The Scope of Technical Services is defined in Appendix 1.

  1.3 The Time Schedule for the Services is shown in Appendix 2.

  1.4 The Manning Schedule is described in Appendix 3.

  1.5 Consultant shall complete the Services within __________months from the Effective Date of this Contract and furnish the final technical service report, including drawings, designing documents, all kinds of standards and photos, within ____ months. Consultant shall keep aware, free of charge, Client of the latest development of similar projects and any progress made in order to improve the designing of the project.

  Article 2 Both Parties' Responsibility and Liability

  2.1 Client shall furnish to Consultant the pertinent data, technical service reports, maps and information available to him and shall give Consultant the reasonable assistance necessary for carrying out of his duties. Particularly Client shall nominate a general representative who shall be available at reasonable time.

  2.2 Client shall assist Consultant with the responsible authorities for obtaining visas, work permits, and other documents required by Consultant to enter the country and to have access to the Site of the Project. The above expenses shall be borne by Consultant.

  2.3 Consultant shall furnish a sufficient number of competent personnel to perform its obligation hereunder, in addition to those personnel specifically listed in Appendix 3. All personnel employed by Consultant in carrying out the work shall be exclusively Consultant's responsibility, and Consultant shall hold Client harmless from any claims of any kind by Consultant's personnel arising out of any acts by Consultant or its personnel in connection with the work performed hereunder.

  2.4 Consultant shall provide Client with all the technical service reports and relevant documentation within the Scope of Technical Services and within the Time Schedule for the Services.

  2.5 Consultant shall assist Client‘s personnel in his country in obtaining visas and in arranging lodgings. Hotel and boarding expenses shall be borne by Client. Consultant shall supply Client’s personnel with office space and necessary facilities as well as transportation.

  2.6 Consultant shall be responsible for and shall indemnify Client and his employee in respect of injury to person or damage to property occurring in connection with the services, to the extent that such damage or injury directly results from negligence of Consultant's personnel while engaged in activities under this Contract. Consultant shall be liable only to the work under this Contract.

  2.7 Any and all liability of Consultant with respect to this Contract shall be limited to the Total Contract Price received by Consultant for his profession services and shall terminate upon expiration of the warranty period set forth in Article 7.3.

  Article 3 Price and Payment

  3.1 The total contract price is__________(say __________________only) in ________(currency). The breakdown prices of the above mentioned total contract price are as follows:

  Contract Price for Item 1: ______(say ____________only) in________ (currency);

  Contract Price for Item 2: ______(say ____________only) in________ (currency);

  Contract Price for Item 3: ______(say ____________only) in________ (currency);

  Contract Price for Item 4: ______(say ____________only) in________ (currency).

  3.2 The total contract price shall include all the service and technology provided by Consultant. The total contract price shall be firm and fixed and shall not fluctuate with any inflation. The total contract price shall include all charges and expenses incurred by Consultant in performing his obligations both in his own country and in the People's Republic of China and includes the expenses incurred in sending the Technical Documentation to Client's office by all kinds of forms.

  In the event of Force Majeure as defined in the Contract, the total contract price shall be readjusted through friendly negotiations between the parties. If Client requires services not contemplated in the Scope of Services, the parties shall friendly discuss an amendment to the total contract price. Any such amendment shall be in writing countersigned by both parties. This document shall then form integral part of the Contract.

  3.3 All payments to be made by Client to Consultant under the present Contract shall be made by telegraphic transfer. In case of any payment by Client, the payment shall be effected through __________ in China to _________ for the account of Consultant.

  In consideration for the services provided by Consultant hereunder, Client shall effect the payment to Consultant in accordance with the following manner and percentage:

  3.3.1 _______ percent (________ %) of the total contract price, i.e._____________ (Say: ________ only), shall be paid by Client to Consultant within ________ (____) days after the client has received the following documents provided by Consultant and found them in order.

  A. One (1) original and two (2) duplicate copies of Consultant's government approval, or a written statement of the competent authorities or relevant agency of Consultant's country certifying that such document is not required;

  B. One (1) original and one (1) duplicate copy of Irrevocable Letter of Guarantee for advance payment issued by Consultant's Bank in favor of Client covering_______(Say:________ only), specimen of which is as per Appendix 4;

  C. Five (5) copies of profoma invoice covering the total contract price;

  D. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;

  E. Two (2) copies of sight draft.

  The said shall be delivered by Consultant not later than ____days after the effective date of the ________present Contract.

  3.3.2 ________percent (____%) of the Contract price for Item 1, i.e._________ (Say: __________ only) shall be paid by Client to Consultant within _____ (__) days after Client has received the following documents provided by Consultant and found them in order.

  A. Ten (10) copies of technical service report on Item 1;

  B. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;

  C. Two (2) copies of sight draft.

  3.3.3 ________ percent (____%) of the Contract price for Item 2, i.e. ___________ (Say: ____________ only) shall be paid by Client to Consultant within ________ (___) days after Client has received the following documents provided by Consultant and found them in order.

  A. Ten (10) copies of technical service report on Item 2;

  B. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;

  C. Two (2) copies of sight draft.

  3.3.4 ________percent (____%) of the Contract price for Item 3, i.e._________ (Say: __________ only) shall be paid by Client to Consultant within _____ (__) days after Client has received the following documents provided by Consultant and found them in order.

  A. Ten (10) copies of technical service report on Item 3;

  B. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;

  C. Two (2) copies of sight draft.

  3.3.5 ________percent (____%) of the Contract price for Item 4, i.e._________ (Say: __________ only) shall be paid by Client to Consultant within _____ (__) days after Client has received the following documents provided by Consultant and found them in order.

  A. Ten (10) copies of technical service report on Item 4;

  B. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;

  C. Two (2) copies of sight draft.

  3.3.6 ________percent (____%) of the Total Contract price, i.e._________ (Say: __________ only) shall be paid by Client to Consultant within _____ (__) days after Client has received the following documents provided by Consultant and found them in order.

  A. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;

  B. Two (2) copies of sight draft.

  3.4 In case Consultant is liable for paying to Client the penalty under the Contract, Client shall have the right to deduct it from any said payment.

  3.5 The banking charges of both parties incurred in China for the execution of the Contract shall be borne by Client and those incurred outside China shall be borne by Consultant.

  Article 4 Delivery Schedule

  4.1 The deadline for the arrival of the Technical service reports CIF _____ is:

  A. Technical service report on Item 1: _________months after effectiveness of the Contract;

  B. Technical service report on Item 2: _________months after effectiveness of the Contract;

  C. Technical service report on Item 3: _________months after effectiveness of the Contract; and

  D. Technical service report on Item 4: ________months after effectiveness of the Contract.

  4.2 Consultant shall inform Client by fax when the Technical service reports are airmailed to Client indicating the date and number of airway bill. Client shall inform Consultant when the Technical service reports have been received.

  4.3 Should any document be missing or damaged during the transport, Consultant shall be notified accordingly and within two (2) weeks the missing or damaged document shall be replaced by Consultant free of charge.

  Article 5 Confidentiality

  5.1 All data assembled, developed, compiled, reproduced, studied, and prepared in connection with the work done hereunder and furnished to Consultant by Client shall be considered confidential and shall not be divulged to any person, firm or corporation other than Client or its designated representatives. This Clause shall remain binding on Consultant notwithstanding the termination of the Contract for any reason.

  5.2 Within the validity period of Contract, both parties shall take proper measures to keep the materials or information strictly confidential. The other party shall not disclose or divulge to any third party without prior written consent of one party.

  5.3 Either party shall be obliged to keep confidential any secret information of the other party, which either party and its personnel may obtain or be accessible to in the course of the performance of Contract. Either party shall not make use of or disclose such secret information obtained from the other party without prior written permission issued by the other party.

  Article 6 Taxes and Duties

  6.1 All taxes and duties in connection with and in the execution of Contract levied by the Chinese government on Client in accordance with the tax laws of PRC shall be borne by Client.

  6.2 All taxes and duties levied by the Chinese government on Consultant, in connection with and in the execution of Contract, according to Chinese tax laws and the agreement between the government of PRC and the government of Consultant's country for the reciprocal avoidance of double taxation and the prevention of fiscal evasion with respect to taxes on income shall be borne by Consultant.

  Client is legally obliged to withhold, as a withholding agent, the amount of taxes pro rata each taxable payment under Contract and pay them to the relevant Chinese tax authorities. After receiving the tax receipts issued by the relevant Chinese tax authorities for the aforesaid withholding taxes, Client shall forward them to Consultant without undue delay.

  6.3 All taxes and duties arising outside PRC in connection with and in the execution of Contract shall be borne by Consultant.

  Article 7 Warranty

  7.1 Consultant warrants that he has the experience and capability to efficiently and expeditiously perform the services in a satisfactory manner and that the services performed by him under this Contract shall be performed by competent personnel in accordance with accepted standards.

  7.2 In the event of a failure of Consultant to provide Client with satisfactory services within the scope of work described in Appendix 1 at any time for any reason within the control of the Consultant, Client may notify Consultant of such dissatisfaction. Consultant shall be afforded a period of _____ days to correct or remedy the matter. Should Consultant within the time afforded by Client fail to correct or remedy the matter to the satisfaction of Client, all charges shall cease forthwith until such time as Consultant is able to provide satisfactory services in accordance with the Scope of work described in Appendix 1.

  7.3 The Consultant‘s guarantee liability shall expire _____ months after its consultancy service is finally inspected and accepted by Client, or after final payment is made.

  Article 8 Ownership of Technical Service Reports

  8.1 Final version of the technical service report submitted to Client and all relevant data such as maps, plans and supporting material compiled in performing the Scope of Services, shall be the property of Client. Such materials shall be sorted and indexed by Consultant prior to transmission to Client.

  8.2 Consultant shall be permitted to retain copies thereof, provided however that such materials, including the material furnished by Client as stated in Article 5 of this Contract, shall not be used by Consultant for purposes not related with this Project without the prior written approval of Client.

  Article 9 Assignment

  9.1 Neither Client nor Consultant shall assign or sublet their rights or obligations hereunder without the prior written consent of the other party.

  Article 10 Termination

  10.1 If, due to the responsibility of Consultant, the technical service reports have not been delivered at dates according to the delivery schedules as stipulated in Article 4 of the Contract, Consultant shall be obliged to pay to Client penalty for such delay in delivery at the following rates:

  A. ______ percent (____%) of the total contract price per week for the first four weeks;

  B. _____ percent (____%) of the total contract price per week from the fifth week to the eighth week;

  C. ______ percent (____%) of the total contract price per week from the ninth week of delay.

  Odd days less than one (1) week shall be counted as one (1) week for calculating the liquidated damage.

  10.2 The total liquidated damage for late delivery shall not exceed ______ percent (____%) of the total contract price. Payment of the liquidated damage for late delivery shall not release consultant from its obligation to deliver technical service reports.

  10.3 Client may, without prejudice to any other remedy for Consultant's following breach of Contract, terminate Contract in whole or in part by a written notice of default send to Consultant, if Consultant

  A. Fails to deliver any or all of technical service reports within______(____) days after the scheduled delivery date as specified in Article 4; or

  B. Fails to make the technical service reports meet the minimum level of Acceptance Standards as specified in Appendix 1.

  Consultant shall refund to Client all the payments effected by Client to Consultant plus an interest at the rate of______ percent (____%) per annum in case of such a termination.

  10.4 Either party may, without prejudice to any other remedy, terminate Contract in whole or in part by a written notice send to the other party, if the other party.

  A. Fails to perform its confidentiality obligation under Contract; or

  B. Fails to perform any other obligations under Contract except minor parts thereof, and does not remedy for its failure within a period of______ (____) days upon receipt of the written notice or a period agreed upon between the parties;

  C. Becomes bankrupt or insolvent; or

  D. Affected by any event of Force Majeure for more than ______ days.

  Article 11 Force Majeure

  11.1 Should either party be prevented from performing any of its obligations under Contract due to event of Force Majeure, such as war, serious fire, typhoon, earthquake, flood and any other events which could not be expected, avoided and overcome, the affected party shall notify the other party of its occurrence by fax and send by registered airmail a certificate issued by the competent authorities or agency within fourteen (14) days following its occurrence.

  11.2 The affected party shall not be liable for any delay or failure in performing any or all of its obligations due to the event of Force Majeure. However, the affected party shall inform the other party by fax the termination or elimination of the event of Force Majeure without delay.

  11.3 Both parties shall proceed with their obligations immediately after the cease of the event of Force Majeure or removal of the effects. The validity period of Contract and/or the scheduled period for relative execution of Contract shall be extended correspondingly.

  Article 12 Arbitration

  12.1 Any dispute arising from or in connection with this Contract shall be submitted to China International Economic and Trade Arbitration Commission,Shenzhen Sub-commission for arbitration in accordance with the Commission's arbitration rules in effect at the time of applying for arbitration. The arbitral award is final and binding upon both parties and the applicable law is the material law of P.R.C.

  12.2 Notwithstanding any reference to arbitration, both Parties shall continue to perform their respective obligations under the Contract unless otherwise agreed.

  Article 13 Language and Standards

  13.1 Correspondence except this Contract between Client and Consultant, data and documents made available by Client to Consultant and the technical service reports and drawings prepared by Consultant shall be in the English language.

  13.2 Measures shall be written in the metric system.

  Article 14 Governing Law

  14.1 The construction, validity, and performance of this Contract shall be governed by the laws of the People's Republic of China.

  Article 15 Effectiveness of the Contract and Miscellaneous

  15.1 Both parties shall make effort to obtain the approval from the respective authorities, if necessary, within thirty (30) days after Contract is signed by the authorized representatives of the two parties. Either Party shall notify in writing the other party of the approval date. The later date of approval shall be taken as the Date of Effectiveness of Contract.

  15.2 Contract shall be valid and remain in force for_______(____) years from the Date of Effectiveness.

  15.3 The outstanding credit and debt between the parties under Contract shall not be affected upon the termination or expiration of Contract.

  15.4 Appendices hereof shall be integral parts of Contract and have the same legal force as the text of Contract itself. The text of Contract shall prevail in case of any discrepancies between the text of Contract and Appendices.

  15.5 All amendments, supplements, subtractions, or alterations to Contract shall be made in written form and become valid upon the signature of the authorized representatives of both parties. The valid amendments, supplements, subtractions, or alterations shall from an integral part of Contract and shall have the same legal force as the text of Contract.

  15.6 All communications between the parties shall be in English in written form during implementation of Contract. Faxes concerning important matters shall be confirmed timely by registered or express mails.

  15.7 The Contract is made in two counterparts each in Chinese and English, each of which shall deemed equally authentic. The Contract is in four (4) originals, two (2) for the Buyer and two (2) for the Seller.

  Client: ________________________________________________.

  Address: ______________________________________________.

  Post Code: ____________________________________________.

  Telephone: ________________. Fax: _________________.

  E-mail: _______________________________________________.

  Authorized Representative signature: ____________________.

  Signing Date: __________________________________________.

  Consultant: ____________________________________________.

  Address: ______________________________________________.

  Post Code :____________________________________________.

  Telephone: ________________. Fax: _________________.

  E-mail: _______________________________________________.

  Authorized Representative signature: ___________________.

  Signing Date: __________________________________________.

英文合同 篇3

  SALES CONTRACT

  卖方

  SELLER:

  DESUN TRADING CO., LTD.

  HUARONG MANSION RM2901 NO.85 GUANJIAQIAO, NANJING 210005, CHINA

  TEL: 0086-25-4715004 FAX: 0086-25-4711363

  NEO GENERAL TRADING CO.

  P.O. BOX 99552, RIYADH 22766, KSA

  TEL: 00966-1-4659220 FAX: 00966-1-4659213

  编号NO.: 日期DATE:

  地点SIGNED IN:

  NEO2001026 Feb. 28, 20xx

  NANJING, CHINA

  买方 BUYER:

  买卖双方同意以下条款达成交易:

  This contract Is made by and agreed between the BUYER and SELLER , in accordance with the terms and conditions stipulated below.

  允许 With

  溢短装,由卖方决定

  More or less of shipment allowed at the sellers’ option

  USD THIRTEEN THOUSAND TWO HUNDRED AND SIXTY ONLY.

  5. 总值

  Total Value

  6. 包装

  Packing

  7. 唛头

  Shipping Marks

  EXPORTED BROWN CARTON

  ROSE BRAND 178/20xx RIYADH

  8. 装运期及运输方式 Not Later Than Apr.30, 20xx BY VESSEL

  Time of Shipment & means of Transportation

  9. 装运港及目的地 From : SHANGHAI PORT, CHINA

  Port of Loading & Destination To : DAMMAM PORT, SAUDI ARABIA10. 保险 TO BE COVERED BY THE BUYER.

  Insurance

  11. 付款方式 The Buyers shall open through a bank acceptable to the Seller an Irrevocable Letter of Credit payable at sight

  Terms of Payment of reach the seller 30 days before the month of shipment, valid for negotiation in China until the 15th day after the date of shipment.

  12. 备注

  Remarks

  The Buyer

  NEO GENERAL TRADING CO.

  (signature)

  The Seller

  DESUN TRADING CO., LTD.

  (signature)

英文合同 篇4

  Employment Contract

  甲方(用人单位)

  Party A:

  地址:

  法定代表人:

  乙方(劳动者)

  Party B:

  身份证号码:

  ID No:

  住址:

  依照《中华人民共和国劳动法》有关规定,结合本公司实际,甲乙双方本着平等、自愿、协商一致的原则达成如下协议

  According to the Labor Law of PRC China, Party A and Party B agree as follows:

  一、本合同期限 Contract Period

  本合同期______年__ 月 __日起至______年 ___月___日或本本合同约定终止条件出现时止。

  This agreement is valid from (Y/M/D) until (Y/M/D) or terminated by either party

  二、工作内容和工作时间 Responsibility & working hours

  1. 甲方聘请乙方担任 部门 职务,详见职务说明书。

  Party B's Department: Party B's position:

  Please refer to the job description for details.

  2. 乙方须完成甲方安排的生产(工作)任务

  Party B must accomplish his/her regular work and additional assignments on time

  3. 每天工作8小时,每周工作共40小时。

  There are 8 working hours a day, 40 working hours a week.

  4. 甲方如因业务拓展变化需要对乙方的工作岗位及工作区域进行调整,乙方应当接受。如因甲方公司业务扩展需要或公司合并分立等变更,乙方同意按照法律规定延续此本合同,并接受甲方安排,在____(某地区)工作。

  If Party A needed to adjust Party B‘s position and working area for business development variety, Party B should accept it.

  三、工资 Salary

  乙方每月的基本工资:RMB 绩效工资:RMB 综合福利金:RMB ,工资总额为RMB 元(该金额尚未扣除税金、住房费用以及社会保险中个人应缴的部份),另甲方予以乙方工资总额7%的住房公积金(如法律规定住房公积金缴交基数有上限,则依照法规执行)试用期满,经考核后,根据考核结果确定是否正式录用,正式录用后薪金保持不变。甲方将视公司的盈利情况和乙方的考核结果,于每年的三月份进行薪金调整。

  Party B's monthly total revenue (before the deduction of tax, housing fund, social insurance paid by individual) each month would be RMB______ , including base wage RMB______ performance salary RMB_______and social welfare RMB______, And Party A will offer Party B 7% housing fund base on the total revenue, or any upper limit set by the local authority, whichever is the lower. After probation total revenue would be unchanged. Party B's salary will be reviewed annually in March and adjusted in light of Party B's performance and prevailing conditions.

  四、工资的发放 Payment

  甲方于每月_____日前通过银行转帐支付发放上月工资。

  Salary will be paid to Party B's account by T/T before the ____th of the following month.

  五、超时工作 Over Time

  乙方应致力于提高工作效率,按时完成生产、工作任务。如因特殊情况需要加班,可自行安排。如乙方希望通过自行安排加班取得加班费,则乙方必须在加班前四小时填写加班申请表呈总经理审批。否则,视为无效加班,详见《员工手册》。

  Party B must try his best to increase the working efficiency to meet Party A's requirement. If there are special circumstances that Party B has to work overtime, Party B can arrange by themselves. If Party B requests OT payment, he/she must fill in the OT application form and have it approved by GM. OT Application Form without authorized signature is not valid.

  六、加班费 OT Compensation

  乙方经甲方批准在工作日加班,甲方必须支付给乙方基本工资150%的报酬;休息日被安排工作而甲方又不能够给予乙方同等时间的补休,则甲方须支付给乙方基本工资200%的报酬;若在国家法定休假日被安排工作,甲方付给乙方基本工资300%的报酬。

  If Party B works over time and has approved by Party A, he/she will be offered the same period of compensation leave or OT salary according to Labor Law of PRC China.

  七、假期与福利 Holiday & Benefits

  1. 有薪国家法定假日 Statutory Holiday of PRC China with pay

  2. 有薪婚假/产假/丧假 Leave for Marriage, Maternity and Mourning with pay.

  3. 有薪年假 Annual leave with pay

  4. 社会保险 Social Insurance

  5. 年度奖金Annual bonus (based on the months worked with party A at the rate of one month‘s wage for each full year worked. )

  详情请参照《员工手册》Please refer to Party A's employee manual for detail info.

  八、劳动纪律 Discipline

  乙方应严格遵守甲方制定的各项规章制度和劳动纪律(详请请参照《员工手册》执行)

  Party B shall strictly obey Party A‘ regulations and discipline. Please refer to Party A's employee manual.

  九、保密协议 Confidentiality

  乙方需严格保守工作过程中接触和了解到的公司商业秘密(包括生产技巧、工艺流程、技术秘密、管理方法、产销策略、货源情报、设计图纸、成本价格和客户资料),否则将受到行政处罚(如无条件解雇、赔偿等);触犯刑法的,甲方将有权移交司法机关处理。乙方调离甲方,应得到甲方同意,并将所有商业秘密资料移交甲方,同时承担不向外泄露的义务,并保证半年内不得利用甲方商业秘密在生产同类且与甲方有竞争关系的产品的其他企业内任职。否则,甲方有权要求乙方赔偿因此而带来的一切经济损失。

  The recipient shall undertake the obligation to keep confidential, in accordance with the scope and duration agreed upon by both parties, the technical secrets contained in the technology provided by the supplier, which have not been made public.

  十、本合同终止 Termination

  1. 终止本本合同条件 Termination conditions

  A. 试用期间,双方皆可即时通知对方解除本本合同;

  During the probation period, either side can terminate the contract by immediate effect.

  B. 试用期满后,任何一方欲解除本合同,须提前三十日以书面形式通知对方。否则,违约方须向守约方支付违约金(违约金为乙方一个月的工资),若造成守约方经济损失的,应依法承担赔偿责任。

  Either side can terminate the contract by giving 30 days notice in written form after probation period.

  2. 甲方在下列情况下可随时直接地通知乙方解除本本合同,无须履行任何法定义务和手续,无须向乙方补偿If any case of the following circumstances, Party A has the right to inform Party B rescission of the contract:

  A. 乙方在试用期间达不到甲方的要求;Party B‘s performance can’t meet Party A‘s requirement.

  B. 乙方严重失职,给甲方利益造成重大损失的;

  The other party has breached the contract, to the extent that such breach has seriously affected the economic benefits expected when concluding the contract

  C. 违反甲方有关规定,应予开除的,详情请参照《员工手册》执行。The condition agreed on in the Party A's employee manual for rescission of the contract has arisen

  3. 乙方在下列情况下终止本本合同不需向甲方补偿

  If any one of the following circumstances, Party B has the right of inform Party A rescission of the contract without any compensation:

  A. 被非法限制人身自由的手段强迫劳动的;

  Party B is forced to work by illegal means.

  B. 未按本本合同约定支付劳动报酬或劳动条件的;

  Party B cannot get the salary or working conditions which agreed in the contract.

  十一、甲、乙双方须共同遵守国家有关法规以及甲方《员工手册》的有关规定。

  Both Party A and Party B shall obey the related regulation of PRC China and Party A's employee manual.

  十二、本本合同自甲方盖章、乙方签署之日起生效。

  This contract shall come into effect since both sides sign their names.

  十三、本本合同以中文版本为准,本合同一式二份,甲、乙双方各执一份。

  N.B. In case of divergence, the Chinese texts shall be regarded as authentic. Two originals, one for Party A, the other one for Party B.

  甲、乙双方签署同意以上条款The above terms is agreed by:

  甲方(Party A) 签署日期(Date)

  乙方(Party B) 签署日期(Date)

英文合同 篇5

  DATE :C/NO :

  Inv. No:

  PART A:

  PART B:

  BOTH OF THE 2 COMPANIES ( PART A AND PART B) AGREED

  TO PAY THE COMMISSION FOR THE BUSINESS BETWEEN THEM AS FOLLOWS:

  1. BUSINESS ITEMS:

  PRODUCTS:FABRIC

  QUANTITY:76000M(CONTRACT)

  PRICE:FOB USD7.45/M ECT.

  AMOUNT: USD593,500.00(CONTRACT)

  AMOUNT: USD531,622.55(ACTUALLY)

  2. COMMISSION ITEMS:

  COMMISSION: FOR THE TOTAL AMOUNT .

  COMMISSION AMOUNT: USD21,124.70

  3. PAYMENT ITEMS:

  PART A SHOULD PAY THE COMMISSION BY T/T .

  Confirmed By:

  PART A: PART B:

  DATE :C/NO :

  Inv. No:

  PART A:

  PART B:

  BOTH OF THE 2 COMPANIES ( PART A AND PART B) AGREED TO PAY THE COMMISSION FOR THE BUSINESS BETWEEN THEM AS FOLLOWS:

  3. BUSINESS ITEMS:

  PRODUCTS:MEN’S SUITS

  QUANTITY:2877UNDS

  PRICE:FOB EUR40.60/UNIT

  AMOUNT: EURO116,806.20

  4. COMMISSION ITEMS:

  COMMISSION: FOR THE TOTAL AMOUNT .

  COMMISSION AMOUNT: USD5700.00

  3. PAYMENT ITEMS:

  PART A SHOULD PAY THE COMMISSION BY T/T .

  Confirmed By:

  PART A: PART B:

英文合同 篇6

  Technical Consultancy Service Contract

  Contract No.:________________________.

  Date of Signature:____________________.

  Place of Signature:____________________.

  This Contract is made and entered into through friendly negotiation by and between China____________________ (hereinafter referred to as “Client”), as one party, and____________________ (hereinafter referred to as“Consultant”),as the other party, concerning the technical consultancy service of__________, under the following terms and conditions:

  Article 1 Contents of Technical Consultancy Service

  1.1 Whereas Client desires to obtain the technical consultancy service of from Consultant and Consultant has agreed to perform such services.

  1.2 The Scope of Technical Services is defined in Appendix 1.

  1.3 The Time Schedule for the Services is shown in Appendix 2.

  1.4 The Manning Schedule is described in Appendix 3.

  1.5 Consultant shall complete the Services within__________months from the Effective Date of this Contract and furnish the final technical service report, including drawings, designing documents, all kinds of standards and photos, within____months. Consultant shall keep aware, free of charge, Client of the latest development of similar projects and any progress made in order to improve the designing of the project.

  Article 2 Both Parties' Responsibility and Liability

  2.1 Client shall furnish to Consultant the pertinent data, technical service reports, maps and information available to him and shall give to Consultant the reasonable assistance necessary for carrying out of his duties. Particularly Client shall nominate a general representative who shall be available at reasonable time.

  2.2 Client shall assist Consultant with the responsible authorities for obtaining visas, work permits and other documents required by Consultant to enter the country and to have access to the Site of the Project. The above expenses shall be borne by Consultant.

  2.3 Consultant shall furnish a sufficient number of competent personnel to perform its obligation hereunder, in addition to those personnel specifically listed in Appendix 3. All personnel employed by Consultant in carrying out the work shall be exclusively Consultant's responsibility, and Consultant shall hold Client harmless from any claims of any kind by Consultant's personnel arising out of any acts by Consultant or its personnel in connection with the work performed hereunder.

  2.4 Consultant shall provide Client all the technical technical service reports and relevant documentation within the Scope of Technical Services and within the Time Schedule of the Time Schedule for the Services.

  2.5 Consultant shall assist Client'S personnel in his country in obtaining visas and in arranging lodgings. Hotel and boarding expenses shall be borne by Client. Consultant shall supply to Client'S personnel office space and necessary facilities as well as transportation.

  2.6 Consultant shall be responsible for and shall indemnify Client and his employee in respect of injury to person or damage to property occurring in connection with the services, to the extent that such damage or injury directly results from negligence of Consultant's personnel while engaged in activities under this Contract.Consultant shall be liable only to the work under this Contract.

  2.7 Any and all liability of Consultant with respect to this Contract shall be limited to the Total Contract Price received by Consultant for his profession services and shall terminate upon expiration of the warranty period set forth in Article 7.3.

  Article 3 Price and Payment

  3.1 The total contract price is__________(say __________________only) in________(currency). The breakdown prices o the above mentioned total contract price are as follows:

  Contract Price for Item 1: ______(say ____________only) in________ (currency); Contract Price for Item 2: ______(say ____________only) in________ (currency); Contract Price for Item 3: ______(say ____________only) in________ (currency); Contract Price for Item 4: ______(say ____________only) in________ (currency).

  3.2 The total contract price will include all the service and technology provided by Consultant. The total contract price shall be firm and fixed and shall not fluctuate with any inflation. The total contract price shall include all charges and expenses incurred by Consultant in performing his obligations both in his own country and in the People's Republic of China and includes the expenses incurred in sending the Technical Documentation to Client's office by all kinds of forms.

  In the event of Force Majeure as defined in the Contract, the total contract price shall be readjusted through friendly negotiations between the parties. If Client requires services not contemplated in the Scope of Services the parties shall friendly discuss an amendment to the

  total contract price. Any such amendment shall be in writing countersigned by both parties. This document shall then form integral part of the Contract.

  3.3 All payments to be made by Client to Consultant under the present Contract shall be made by telegraphic transfer. In case of any payment by Client, the payment shall be effected through__________in China to _________ for the account of Consultant.

  In consideration for the services provided by Consultant hereunder, Client shall effect the payment to Consultant in accordance with the following manner and percentage:

  3.3.1 _______ percent (________ %) of the total contract price, i.e._____________ (Say: ________ only), shall be paid by Client to Consultant within ________ (____) days after the client has received the following documents provided by Consultant and found them in order.

  A. One (1) original and two (2) duplicate copies of Consultant's government approval, or a written statement of the competent authorities or relevant agency of Consultant's country certifying that such document is not required;

  B. One (1) original and one (1) duplicate copy of Irrevocable Letter of Guarantee for advance payment issued by Consultant's Bank in favor of Client covering_______(Say:________ only), specimen of which is as per Appendix 4;

  C. Five (5) copies of profoma invoice covering the total contract price;

  D. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;

  E. Two (2) copies of sight draft.

  The said shall be delivered by Consultant not later than ____days after the effective date of the ________present Contract.

  3.3.2 ________percent (____%) of the Contract price for Item 1, i.e._________ (Say: __________ only) shall be paid by Client to Consultant within _____ (__) days after Consultant has received the following documents provided by Consultant and found them in order.

  A. Ten (10) copies of technical service report on Item 1;

  B. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;

  C. Two (2) copies of sight draft.

  3.3.3 ________ percent (____%) of the Contract price for Item 2, i.e. ___________ (Say: ____________ only) shall be paid by Client to Consultant within ________ (___) days after Licensee has received the following documents provided by Consultant and found themin order.

  A. Ten (10) copies of technical service report on Item 1;

  B. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;

  C. Two (2) copies of sight draft.

  3.3.4 ________percent (____%) of the Contract price for Item 3, i.e._________ (Say: __________ only) shall be paid by Client to Consultant

【英文合同范文6篇】相关文章:

1.英文合同范文5篇

2.英文合同范文8篇

3.英文合同范文六篇

4.英文合同范文7篇

5.英文合同范文合集9篇

6.【实用】英文求职信范文锦集六篇

7.【推荐】英文感谢信范文锦集五篇

8.关于英文感谢信范文锦集6篇

9.精选英文道歉信范文锦集6篇